Current Bellevue Traffic Advisories 10/24/25
- Washington State Department of Transportation SR 520 Bridge Replacement and HOV Program.
- Overnight closures of Westbound SR 520 (and its associated on and off-ramps) and the SR 520 Trail will close across Lake Washington between 92nd Avenue Northeast in Clyde Hill to I-5 in Seattle the following times each day:
- Friday, Oct 24 11 p.m. to 8 a.m., Saturday, Oct. 25.
- Saturday, Oct 25: 11 p.m. to noon Sunday, Oct. 26 (People heading to the Saturday UW football game can begin crossing westbound SR 520 at 8 a.m.)
- Sunday, Oct. 26: 11 p.m. to 5 a.m. Monday, Oct. 27
- Overnight closures of Westbound SR 520 (and its associated on and off-ramps) and the SR 520 Trail will close across Lake Washington between 92nd Avenue Northeast in Clyde Hill to I-5 in Seattle the following times each day:
- Washington State Department of Transportation I-90 - Sunset Creek - Fish Passage project updates:
- Southeast Eastgate Way has re-opened in both directions. Intermittent single-lane closures on Southeast Eastgate Way will continue through much of 2026 to complete work below and alongside the new bridge.
- Overnight directional closures on westbound and eastbound I-90 are scheduled Nov. 3 and Nov. 4 for sign installation:
- Westbound I-90 at Southeast 150th Street will close Nov. 3 at 11:59 p.m. and re-open at 4 a.m. on Nov. 4.
- Eastbound I-90 will close at Factoria Boulevard will close Nov. 4 at 11:59 p.m. and re-open at 4 a.m. on Nov. 5.Ramps connecting I-405 and I-90 also will close each night, with separate signed detours in place.
- NEW— Emergency Sewer Repair on EB NE 24th from Bel-Red to 156th Ave NE: 24/7 road closure of Eastbound NE 24th between Bel-Red Rd and 156th Ave NE starting 7a.m. Monday, Oct 20 through 12 p.m. Friday, Oct. 24. Please follow detour signs and expect long delays.
- NE 4th Street between Bellevue Way and 100th Ave NE: Westbound closure of NE 4th scheduled 8 p.m. - 5 a.m. from Oct. 16 – Nov. 7 for catch basin installations.
- NEW—NB 152nd Avenue SE between SE 4th Street - Main Street & SB 154th Ave SE from SE 4th St to Lake Hills Blvd: Directional closures scheduled 7 a.m. – 5 p.m. from Oct. 20-Oct.23 for concrete curing.
Sign up to receive advisories to your email.